MENU

About us

PHANTOM : Creating the future from waste

Apparatus to detoxify and treat various types of organic waste

PHANTOM features
  • Decompose waste previously impossible or difficult to decompose
  • Only harmless residue is produced through PHANTOM
  • Close to no carbon dioxide produced

Product characteristics

PHANTOM produces sub-critical water with saturated steam at high temperature and high pressure, which hydrolyses organic waste and lowers molecular weight.
Since PHANTOM does not burn, it prevents the generation of dioxins and suppresses the generation of carbon dioxide.
PHANTOM has a simple structure, and the maintenance process is the same as for pressure tank packing replacement and boilers, keeping the cost of regular inspections low.

PHANTOM features

Economical

Cost efficiency

Introducing PHANTOM will make it possible to reduce the otherwise high cost of industrial waste disposal,leading to improved profitability.

Efficiency

3 tonnes of waste decomposed within 45 minutes

With overwhelmingly high processing power compared to other similar products, it is heightens the possibility investment recovery and improves business efficiency.

Variety

Break down various types of waste

Proven success in decomposing a wide variety of industrial waste. It is also possible to decompose multiple types of industrial waste at the same time.

Safety

Water treatment ensures safety

Safely treats various industrial wastes without generating carbon dioxide or dioxins.

Utility

Possible reuse of residues

In addition to treating waste, it is possible to reuse the residue for fertilizer, feed or fuel to improve profitability.

Simplicity

Easy operation for any user

The device is automatically operated with touch buttons, making it very easy to use.The operation method changes depending on the input.

How PHANTOM works

Put in plastic bottles(waste) and water

Insert vapor to attain a subcritical state at approx. 200℃, 20 atmospheric pressure

Water turns into H⁺ and OH⁻ in a subcritical state,where they fly around at high speed and collide to generate plasma

Hydrolysis occurs, where H⁺ and OH⁻ flying around at high speed decompose high molecular into low molecular

Waste is safely processed with no carbon dioxide or dioxin produced. The residues are sterilized and detoxified.

PHANTOM Installation example

  1. Electrolytic high pressure tank
  2. Hopper700*700*300
  3. Boiler1200*2400*2000
  4. Deodorant/silencer10000*2000H
  5. Operation board1000*1800
  6. 3F Stand
  7. 2F Stand
  8. IN Ball pipe
  9. OUT Ball pipe
  10. Drive monitor

Installation of PHANTOM recycling plants

  1. Electrolysis/high pressure processing machine
  2. Boiler
  3. Crusher
  4. Input conveyor
  5. Discharge conveyor
  6. Pellets, power generation, heat treatment (volume reduction) and other production line
  7. Operation board

③④⑤⑥are optional

What PHANTOM can treat

PHANTOM test results using plastic bottles

Input

500 plastic bottles for cold beverages (with caps and labels) 
Water (60L of drinkable groundwater)

Wastewater after treatment

20L water content (milky in color)

Constituents in water

Refer to the result of analysis (harmless)

Precipitates

Approx. 10% of water-soluble components
※Turning into powder after being strained and dried, the amount will be reduced to approximately 1 percent.

Toyo Environmental Laboratory, K.K.

The environmental burdens of discharging the processed water after treatment into sewers need to be analyzed separately, as each industry has its own treatment method and standard.

Solvable Challenges

We are faced with challenges with no immediate solution in sight such as plastic bottles and plastic waste in the ocean, livestock waste, pollutants, and final disposal site.
As one of the answers to these waste disposal issues, we developed an apparatus that makes plastic waste harmless and drainable in just 35 minutes through high pressure plasma electrolysis, which would become one of the solutions to the challenges of waste disposal. In addition, it detoxifies a variety of waste, including livestock waste, kitchen refuse, food waste, and fishery waste, and turn them into fertilizers. It would also help to tackle a variety of social issues.

Lineup

スクロールできます
3㎥
(3t)
2㎥
(2t)
1㎥
(1t)
0.5㎥
(0.5t)
Basic
machine
weight
12ton10ton4ton3ton
Size of the
pressure
vessel
(diameter)
190cm160cm110cm80cm
Size of the
input port
(diameter)
30cm30cm20cm20cm
Maximum
possible
load
3ton2ton1ton0.5ton
Anticipated
amount of
discharge
1.8ton1.2ton0.6ton0.3ton
Actual
treatment
time
45min.45min.30min.30min.
Estimated
treatment
utility cost
3,000yen3,000yen3,000yen3,000yen
The following is included in the selling price.
  1. Basic machine/Pressure vessel, mixer, motor, ball valve, control panel, piping, frame, lift for products
  2. Boiler (30 atmospheric pressure/Steam generation quantity@1 ton/H)
  3. Tank, piping etc., surface treatment cost
  4. Charges:Design, gauges and instruments, cost of on-site assembly operation
The following is not included in the selling price.
  1. Land, building, belt conveyer
  2. Resizing of the valves for custom specification,charges involved in changing the frame

From pricing to delivery

Please contact us for price quotations.

Making proposals

Free of charge

Time frame:
About 4weeks


Defining production requirements

  • The amount of organic waste your company treats in a day
  • The content of the waste
  • The current waste sorting method
  • Whether or not a building could be set up
  • The condition of the ground, etc.
Signing a contract

Deposit:50%

Time frame:
About 3weeks


Contracts/
Arrangements

  • Getting an approval for the proposed design
  • Executing an agreement
  • Setting up a building
  • Checking the condition of the ground
Manufacturing of the product

The remainder of the payment:30%

Time frame:
About 6months


Manufacturing/
Test operation

  • On-site inspection
  • Applying to Labour Standards Inspection Office for manufacturing approval
    First class pressure vessel
  • Manufacturing (5 to 6months)
  • Test operation
  • Witnessed demonstration/Approval
Completing the installation/ Starting the operation

The remainder of the payment:20%

Time frame:
About 2weeks


Making a contract on operation and maintenance

  • On-site installation work
  • Test operation
  • Screening by the Labor Standards Inspection Office
  • Delivery→Completion

*The operator training will be done using our 1m3 equipment during the manufacturing period.